  • Al Rehman Garden Phase 7: Infrastructure Progress

    Al Rehman Garden Phase 7 is seeing steady on‑ground development, with road surfacing, utility installation and home construction progressing across its blocks.

    Main Entrance and Community Aesthetics

    The entrance features a wide paved main boulevard lined with decorative street poles, landscaped median beds, ornamental urns and palm trees, and a security checkpoint monitoring traffic at the gateway. Inside, large architectural monuments and finished roundabouts with stone masonry and green belts are regularly watered and landscaped. The central administrative head office, with a white circular facade and arched architecture, sits near the entry zone alongside commercial storefronts and developer offices.

    Status of Established Sectors: Blocks A and B

    The early phases, including Block A, Block B, Haider Block and adjacent sectors, show advanced habitation and structural readiness:

    • Underground Utilities: Electrical wiring has been routed underground throughout the developed sectors to preserve street aesthetics.
    • Active Home Construction: Multiple multi-story residences are actively being built, featuring brickwork, concrete slab casting, and reinforced damp-proofing at the foundation level.
    • Completed Residences: Several modern houses are already inhabited, serviced by paved asphalt roads, curbs, and street lighting.
    • Community Amenities: These sectors feature central green parks, demarcated open spaces, and an operational white grand mosque in Block B.
    • Commercial Rows: Dedicated commercial zones along the avenues are active, with several retail structures and multi-story business premises under development.

    Block A Extension and Commercial Avenues

    In the Block A Extension, clear demarcations separate residential sectors and commercial avenues. The sector includes land reserved for educational facilities, such as a planned site for The Lahore City School, and plot sizes with commercial frontages measuring two to four marlas along secondary access roads and wide boulevards.

    Infrastructure Expansion in Block D

    Development activity is concentrated heavily across Block D, spanning sectors D1, D2, D3 and D4:

    • Road Tracing and Compaction: Heavy earthmoving machinery, including motor graders and vibratory soil compactors, is preparing sub‑base surfaces along main and connecting streets.
    • Signboard Installation: Street and block directional signs (such as Block D1 Street 01 and Street 10) have been erected at intersections to mark plot boundaries and street alignments.
    • Base Layer Application: Crushed stone and aggregate layers are actively being hauled and spread by tractor‑trailers, followed by grading and water compaction to prepare roads for asphalt surfacing.
    • Sewerage Alignment: Subterranean drainage lines have been installed, and concrete manhole covers are systematically being brought to ground level in preparation for final road surfacing.

    Earthworks and Sewerage Progress in Block C

    Block C (encompassing sectors C1, C2 and C3) represents another key development frontier within the society:

    • Underground Drainage: Heavy excavators are working along the perimeter and street corridors to level trenches and install drainage infrastructure.
    • Sub-base Preparation: Material trucks are unloading crushed stone aggregate along primary pathways, where graders and rollers level the corridors into uniform roadbeds.
    • Future Road Links: Graded paths are connecting internal sector routes to government‑access roads and external boundaries.

    Throughout both Block C and Block D, central green medians along the wide avenues have been filled with topsoil in preparation for landscaping, curbs and paved footpaths once asphalt carpet laying commences.

    کیا آپ رئیل اسٹیٹ مارکیٹ کے تازہ ترین رجحانات سے باخبر رہنا چاہتے ہیں؟
    محفوظ اور منافع بخش سرمایہ کاری کے فیصلوں کے لیے ہمارا آفیشل واٹس ایپ چینل آج ہی فالو کریں! ہم آپ تک پہنچاتے ہیں مارکیٹ کی درست ترین معلومات اور بروقت تجزیات۔ 📈✨

    👇 ابھی ہمارے چینل کا حصہ بنیں:
    https://whatsapp.com/channel/0029Va8D7O511ulLB3FgCK0u

    Choudry Mujahid Yasin (CMY ) Owner of LahoreRealEstate.Com
    https://wa.me/923224929992 Direct message to me now

  • Union Town Installment Update. & Development Review

    Once a file enters cancellation proceedings, property holders risk losing both the capital invested and potential market profits. To avoid complications, file holders should obtain an updated account statement directly from the head office.

    Reviewing your current financial ledger confirms the exact status of your property and ensures that any record discrepancies are resolved before penalties or cancellation notices take effect. Adhering to the agreed-upon payment terms maintains uninterrupted plot ownership.

    On-Ground Infrastructure and Development Progress Alongside financial compliance updates, rapid on-site progress has been delivered ahead of standard timelines. The development work reflects high standards of planning and execution throughout the community.

    Road Infrastructure: Clean, fully paved, and carpeted roads have been laid across the society, complete with functional street lighting and landscaped green belts along major avenues. Security Framework: A dedicated security system has been put in place to ensure a safe living environment for incoming residents.

    Residential Construction: Construction activity has commenced in E Block, where private owners have initiated work on their homes. Commercial Corridors: Commercial spaces, including prime 2.66 Marla and 8 Marla commercial zones along Pine Avenue Road, are actively advancing toward commercial operations.

    C Block Structure Plan Road: Work is underway on the strategic structure plan road connecting C Block toward key destinations, including Raiwind Road, DHA EME, and Bahria Town, significantly improving regional connectivity. Market Outlook and Future Milestones With fast-paced delivery and expanding road access, market value within the project continues to show strong upward potential.

    Projections suggest that once fully established, 5 Marla plots within the community could trade in the estimated range of 1.50 Crore to 1.80 Crore, supported by steady rental demand and community amenities. Looking ahead toward 2026, the master development plan incorporates community celebrations, major promotional milestones, and grand year-end events to mark ongoing project achievements.

    Investors who remain current on their installment obligations stand in the best position to benefit from these upcoming advancements. Union Town has released an official public notice addressing all members and property owners who have invested in residential and commercial plots.

    For those holding files in the project, taking note of payment schedules and understanding on-ground infrastructure milestones is crucial to safeguarding investments and maximizing capital appreciation. Official Notice: Installment Deadline and Discounts The management has issued an important deadline of November 15 for clearing all outstanding dues.

    Investors holding residential plots in sizes of 3 Marla, 5 Marla, 10 Marla, and 1 Kanal, as well as commercial property owners, are instructed to settle their overdue installments by this date. A key highlight of this announcement is the availability of a special discount for members who submit their pending installment payments prior to the November 15 cutoff.

    Taking advantage of this concession allows investors to reduce their overall cost while bringing their accounts into good standing. Protecting Plot Files from Cancellation For investors whose payments have remained pending since May or earlier, immediate action is recommended.

    Defaulting on consecutive installments places files at risk of moving toward formal cancellation.

    Contact information
    Name: Choudry Mujahid Yasin ( CMY )
    Phone: +923224929992 Whatsapp Available

  • Park View City Lahore: New Gateway Infrastructure & Propert

    The unveiling of The New Gateway along Multan Road has fundamentally transformed access to Park View City Lahore. This 400-foot entrance leads directly onto a 200-foot main boulevard featuring a five-lane thoroughfare, dramatically improving connectivity for commuters traveling from Sahiwal toward Thokar Niaz Baig.

    Construction was completed in approximately one month, with earthworks, boundary modifications, grading, asphalt carpeting, lane markings, and electrification all finalized rapidly. The removal of the previous boundary wall and completion of the full five-lane boulevard has created an active, operational thoroughfare that links directly into the society's central roundabout near the Tulip and Overseas sectors.

    This strategic expansion has repositioned key residential blocks. The Tulip Block and Tulip Overseas Block, once considered peripheral, now sit at the front of the development, making them highly accessible front-row sectors. Upon entering from the new boulevard, residents immediately encounter the Tulip Overseas Block along the left and the standard Tulip Block to the right, both experiencing increased footfall and activity.

    The infrastructure upgrades have directly impacted property values. Just three months prior to completion, standard five-marla residential plots in the area traded around 47 to 48 lakh rupees. Within a ninety-day window, values rose by roughly 20 to 25 lakh rupees. Currently, entry-level five-marla plots in the Overseas sector begin around 55 lakh rupees. Across the community, five-marla plots now command prices ranging between 1.20 crore and 1.30 crore rupees, with segments near embankments potentially increasing by an additional 10 to 15 lakh rupees over the next two to four months as on-ground development continues.

    A central feature of the 200-foot main boulevard is its planned commercial corridor. The master plan designates dedicated commercial parcels for use by residents and visitors, including 5-marla, 8-marla, and 1-kanal commercial plots. These spaces are positioned to support multi-story buildings, corporate offices, retail outlets, and dining establishments, capitalizing on the high visibility and five-lane road capacity.

    Beyond the boulevard, active residential construction is underway across Silver Block, Platinum Block, and Crystal Block. Single-family homes and multi-story residences are being built across various street networks, transitioning the society from vacant land to a fully active residential community. Driving through these sectors reveals extensive private home construction that reinforces the community's development timeline.

    Park View City Lahore is designed as an integrated urban environment with comprehensive infrastructure. Underground utilities provide a clean streetscape with all power distribution and service lines routed below ground. Educational facilities include The National School & College campus along the internal boulevard. Civic and religious amenities feature dedicated neighborhood mosques. Sports and recreational areas accommodate open fields and athletic zones. Healthcare provisions are integrated into the master plan, with future hospital facilities planned. The project also accommodates government-backed housing loan schemes for lower-budget options near the Thokar Niaz Baig corridor.

    In summary, The New Gateway's opening has reduced commute distances, established direct highway links, and strengthened the overall infrastructure framework. With rising values in the Tulip and Overseas sectors, active homebuilding across Silver, Platinum, and Crystal blocks, and significant commercial potential along the primary corridor, Park View City Lahore continues to expand its footprint in the suburban Lahore real estate landscape.

    Contact information
    Name: Choudry Mujahid Yasin ( CMY )
    Phone: +923224929992 Whatsapp Available